Categories
Workouts

2014-10-17

41 Railroad – CrossFit Group

Warm-up

– 500 Row

PVC Pipe Warmup

– 10 Pass Throughs

– 10 Twists

– 10 Good Mornings

– 10 Pole Stretches

– 10 Overhead Squats

Burgener Warm-up (No Measure)

BURGENER WARM-UP:

1. Down and “Finish”

2. Elbows High and Outside

3. Muscle Snatch

4. Snatch Lands at 2″, 4″, 6″

5. Snatch Drops

SKILL TRANSFER EXERCISES:

1. Snatch Push Press

2. Overhead Squat

3. Heaving Snatch Balance

4. Snatch Balance without a dip

5. Snatch Balance with a dip

Skill

Squat Snatch – 10:00

Metcon

Metcon (AMRAP – Reps)

AMRAP – 8:00

– 15 Snatches

– 15 Knees to 90

– 12 Snatches

– 12 Knees to 90

– 9 Snatches

– 9 Knees to 90

– 6 Snatches

– 6 Knees to 90

– 3 Snatches

– 3 Knees to 90

– 6 Snatches

– 6 Knees to 90

– 9 Snatches

– 9 Knees to 90

– 12 Snatches

– 12 Knees to 90
Note: Start back at the beginning if you complete the sequence.

Scaled:

– Snatch (45#/35#)

– Situps

Rx’d:

– Snatch (75#/55#)

– Knees to 90 (bring your knees above your hips

RxPlus:

– Snatch (95#/65#)

– Toes to Bar